Capacity450 kW
Units / year6,40,000
Savings / year₹51 L
CO₂ avoided525 t
450 kW across three metal-sheet sheds, synced with the plant's DG sets and delivering 26% of daytime load.
A three-shift auto-components plant needed to bring down a ₹38 lakh monthly power bill. We ran a structural audit of three 1990s PEB sheds, replaced corroded purlins on one, and installed short-rail mounting with walkways so the plant's own team can clean the array weekly.
The challenge
Old purlins, a DG-backed captive load and a 45-day window between production audits.
Our solution
Short-rail mounting, a zero-export controller with DG-sync and night-shift installation to avoid stoppages.