
Fixed-tilt and single-axis tracker plants from 500 kW to 10 MW, with switchyard, SCADA and long-term O&M.
Open land is a powerful asset. We take ground-mount projects from land due diligence and grid feasibility through piling, tracker installation, the HT switchyard and final commissioning.
Our control room in Pune monitors every utility plant around the clock.
What is included
- Land, soil and grid feasibility studies
- Single-axis trackers with stow mode
- 11/33 kV switchyard engineering
- Waterless robotic cleaning
- 24×7 SCADA monitoring


How we deliver it
- Feasibility
- Approvals and land
- Civil and piling
- Mechanical and electrical
- Grid synchronisation
Common questions
Under PM Surya Ghar: Muft Bijli Yojana, homes get ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, so up to ₹78,000 for a system of 3 kW or more. We file the application and the DISCOM inspection for you, and the subsidy is paid directly into your bank account, usually within 30–60 days of commissioning.
Most homes are installed in 2–5 days once the material is on site. End to end, from survey to switch-on including DISCOM approvals, a typical residential project takes 3–5 weeks. Commercial plants take 3–10 weeks depending on size.
Very little. Clean the panels with plain water every 2–4 weeks (more often in dusty areas) and have an annual electrical check. Our O&M plans cover both, along with remote monitoring alerts.
Modules carry a 25–30 year linear performance warranty, inverters 10–12 years and our workmanship 5–10 years depending on the package. All warranties are registered in your name at handover.