
Earthing, cable glands and drain paths: a 20-minute walk-round before the rains saves expensive repairs later.
Monsoon is when installation shortcuts show up. Before the first heavy rain, walk your terrace with this list.
Maintenance

Earthing, cable glands and drain paths: a 20-minute walk-round before the rains saves expensive repairs later.
Monsoon is when installation shortcuts show up. Before the first heavy rain, walk your terrace with this list.
Free, no-obligation
Book a free site survey. An engineer measures your roof, checks shade and sends you a written proposal with the subsidy already worked in, usually within 48 hours.