
Studio Practice
A fixed four-week opening stage, priced separately, so both sides can leave before the expensive part begins.
The opening stage.
Every engagement starts with the same four weeks, priced on its own and not folded into the project fee. It covers a survey, the daylight study, a program written with the client, and three plan options at 1:100.
At the end of the four weeks either side can stop, and the client keeps the drawings. We have ended five engagements this way since 2020, and in each case the reason surfaced in week two rather than month eight.
What we ask for.
We need a budget figure, a date that matters, and the name of the person who decides. Projects without all three tend to produce drawings that please everyone in the room and no one afterward.
We also ask for photographs of rooms the client likes, including rooms they cannot explain. Those are more useful than a list of styles, because they tend to share a quality of light rather than a look.
After the four weeks.
The full fee is set once the program is fixed, as a percentage of construction cost with a floor. We publish the floor, which in 2026 is 18,000 euros, so a small project is not quoted into silence.
From there the stages are conventional: design development, construction drawings, tender, and site. The difference is that the brief arriving at design development has already been tested.
More insights to explore.
Studio Practice·Sep 18, 2026We set the daylight study before the first plan, because a room’s hours decide its purpose.Why We Draw the Daylight Before the Plan.
Materials·Aug 7, 2026Lime plaster costs more to apply and less to keep, and it changes how a wall meets the light.The Case for Lime Plaster in Coastal Houses.
Process·Jun 11, 2026A 1930s warehouse on the Setúbal waterfront, reduced to its frame and rebuilt as one long room.