Industrial sheds · Chakan, Pune
Sahyadri Auto Components Plant
A 2.1 lakh sq ft press-shop and assembly plant with 25-tonne EOT cranes and isolated press foundations.
25 t
EOT crane bays

The brief
Press foundations needed vibration isolation from the precision machining bay next door.
How we built it
Spring-damped press pits on separate rafts, structural steel trusses fabricated off-site and erected bay by bay.
The result
Production started in 13 months; machining tolerances met on day one.
Before and after
BeforeAfter
Drag the line

BeforeAfter⟷
Sahyadri Auto Components Plant
Open project →CHAKAN, PUNE · 13 MONTHS
Timeline
13 months
Mar 2023Piling
Jul 2023Press pits
Nov 2023Steel erection
Apr 2024Production start