Roads & infrastructure · Hosur Road, Bengaluru

Hosur Road Elevated Corridor, Package 2

A 3.2 km four-lane elevated viaduct built over one of the city's busiest roads without closing it.

3.2 km
of viaduct, zero closures
Hosur Road Elevated Corridor, Package 2
The brief

Over 1.2 lakh vehicles a day below, with no full closures allowed.

How we built it

Precast segments cast off-site and launched at night with an overhead launching girder; traffic diversions moved in 400 m stretches.

The result

Opened to traffic in 30 months with no day-time closures.

Before and after

Drag the line

Hosur Road Elevated Corridor, Package 2 before constructionHosur Road Elevated Corridor, Package 2 after handoverBeforeAfter
⟷
Hosur Road Elevated Corridor, Package 2
HOSUR ROAD, BENGALURU · 30 MONTHS
Open project →
Timeline

30 months

Jan 2022Piling
Oct 2022Casting yard live
Mar 2023First span launched
Jun 2024Deck complete
Jul 2024Opened
Location
Hosur Road, Bengaluru
12.880° N · 77.650° E
Gallery
Next project
Vidyaranya School Campus
Open →
Hosur Road Elevated Corridor, Package 2 · Stonebridge InfraMade with ❤️ Appsketch